Laserfiche WebLink
TABLE 11-B-1 <br /> COAL BASIN TUNNEL PROJECT <br /> RECLAMATION SCHEDULE <br /> OF ROADS AND ASSOCIATED WORK AREAS <br /> SUMMER 1979 Face Up <br /> FALL 1979 Reclamation of face-up areas <br /> FALL 1980 Tunnel drilling starts <br /> FALL 1986 Tunnel completed to No . 1 Mine <br /> 1986 Tunnel completed to No . 2 Mine* <br /> 1987 Completion of conveyors, drainage systems, power <br /> systems, bins, shops, offices and bathhouse facilities . <br /> 1986 to 1990 Partial revegetation of mine portals and <br /> associated roads, No . 1 and No . 2 Mines; the actual <br /> work at the portals will begin with general clean up of <br /> non essential materials . The ventilation fans, power <br /> lines and associated equipment and shelter required to <br /> maintain this equipment will remain. The areas of the <br /> tunnel refuse pile not in use will be reshaped, topsoil <br /> added; and grass, shrubs, and trees planted in the <br /> fall. (i.e. , the fall has proven by experiment to be <br /> best time to plant. ) The roads will be reduced from <br /> Haul Roads to Light Use Road classification. (See <br /> November 26, 1979 Coal Basin Road Drainage report . ) <br /> The present width of 50' to 60' would be reduced to 30 ' <br /> to 40 ' . The outside ditch will be brought out into the <br /> road and the cut slope allowed to slough. Grading <br /> material from the road will be allowed to collect on <br /> the outside as a permanent berm in areas not designated <br /> for snow removal . These areas and the cut slopes will <br /> then receive intensified revegetation efforts -- i. e. , <br /> heavier mulch and seed mixtures . <br /> FALL 1988-92 Cuts and berms if stabilized will be planted <br /> with shrubs and trees . <br /> 1987-92 The tunnel will be extended laterally (on the strike) <br /> from No . 1 Mine to No . 3 Mine. <br /> *Actual construction time will depend on mining conditions encountered . <br />