My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (302)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (302)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:15:48 PM
Creation date
9/25/2012 9:25:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br /> Page 6 <br /> Permit NO.: COG-070000 ' <br /> B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Continued) <br /> e/ - Definitions of Sample Type <br /> 1. A "composite" sample, for monitoring requirementk, is a minimum of four(4) grab samples <br /> collected at equally spaced two (2) hour intervals and proportioned according to flow. <br /> 2. A "grab" sample, for monitoring requirements, is a single "dip and take" sample. <br /> 3. An "instantaneous" measurement, for monitoring requirements, is a single reading, observation, or <br /> measurement performed on site. <br /> 4. A "continuous" measurement, for flow monitoring requirements, is a measurement obtained from an <br /> automatic recording device which continually measures flow. <br /> S. An "in-situ" measurement, for monitoring requirements, is defined as a single reading, observation <br /> or measurement taken in the field at the point of discharge. <br /> 6. A "visual" observation, for oil and grease monitoring requirements, is observing the discharge to <br /> check for the presence of a visible sheen or floating oil. <br /> V - In the event an oil sheen or floating oil is observed, a grab sample shall be collected, analyzed, and <br /> reported. In addition, corrective action shall be taken immediately to mitigate the discharge of oil and <br /> 8rease. <br /> g/ - Where based on a minimum of 5 samples, the permittee demonstrates,.to the satisfaction of the Water <br /> Quality Control Division, that the level of Total Dissolved Solids (IDS) in the effluent can be calculated <br /> based upon the level of electrical conductivity, the permittee may measure and report TDS in terms of <br /> electrical conductivity. <br /> h/ - Total Dissolved Solids monitoring is required only for discharges to the Colorado River Basin. See <br /> specific facility certification rationale to determine whether TDS monitoring is required. <br /> C. REPORTING REQUIREMENTS <br /> 1. Revresentative Sampling <br /> Samples and measurements taken as required herein shall be representative of the volume and nature of the <br /> monitored discharge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.