My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-06_REVISION - M2008070 (28)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008070
>
2012-09-06_REVISION - M2008070 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:46 PM
Creation date
9/21/2012 1:37:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
Revision
Doc Date
9/6/2012
Doc Name
ORIGINAL PERMIT (AM-01 EXHIBIT)
From
WESTERN GRAVEL
To
DRMS
Type & Sequence
AM1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i <br />r <br />The anticipated future average total tonnage sold from the site in any one calendar year is <br />250,000 tons. Table D -1 shows a breakdown of the expected average annual production. <br />Table D -1 <br />AVFRAf_F. ANNFAi. P12nn1rTr-rTn1V TITCTDTi.2TTTT"1%T <br />Product <br />Tons Sold <br />% Rejection Rate <br />(Naturals) <br />Tons Mined <br />Road Base <br />140,000 <br />0% <br />140,000 <br />Concrete <br />30,000 <br />10% <br />33,000 <br />Asphalt <br />30,000 <br />40% <br />42,000 <br />Pit Run <br />20,000 <br />0% <br />20,000 <br />Washed A gregate <br />30,000 <br />10% <br />33,000 <br />Total <br />250,000 <br />7% <br />268,000 <br />The total permit area is 191.83 acres. A breakdown of the estimated areas is shown in <br />Table D -2. <br />Table D -2 <br />PERMIT AREA AC RFAf_F.0 <br />Phase 1 <br />20.95 Acres <br />Phase 2 <br />115.44 Acres <br />Future Bridge and Access Area <br />42.83 Acres <br />Office, Scales, and Parking <br />(Valentine) <br />4.16 Acres <br />Office, Scales, and parking <br />(Western Gravel) <br />0.12 Acres <br />Access Road (Valentine) <br />1.67 Acres <br />Access Road (BLM) <br />2.10 Acres <br />Access Road (Love) <br />4.56 Acres <br />Total <br />191.83 Acres <br />Roads will be constructed, upgraded and maintained with road base and will be <br />compacted if necessary. The road crosses three pipelines. The pipelines will need to'be <br />• protected from the addition load in accordance with the pipeline company guidelines. A <br />water truck will be used to control dust on road during operation. <br />Mining will progress starting with Phase 1 and then move to Phase 2. Both Phase 1 and <br />Phase 2 will proceed from west to east. As the mining proceeds the overburden is <br />replaced in the previously mined areas to reclaim the area. By using this method only a <br />portion of the total pit boundary is exposed at a time. Table D -3 shows the phase <br />tonnages, life and exposed area per year of each phase based upon the 250,000 tons per <br />year production (268,000 tons mined). <br />8 <br />- - -- - -- - - - - - -- - - - - - -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.