Laserfiche WebLink
E <br />Table D -3 <br />MTNYN% TnNN A !'_' Ti DV D AID T. A <br />Phase <br />Acres <br />Acres <br />Tons Gravel <br />Gravel Life <br />Exposed <br />(Total) <br />(Mined) <br />(years) <br />Area <br />Acres/Year <br />1 <br />20.95 <br />19.50 <br />512,798 <br />1.9 <br />9.8 <br />2 <br />115.44 <br />111.32 <br />2,341,935 <br />8.7 <br />12.8 <br />r <br />9 <br />I Mining Timetable <br />Mining operations would begin in 2008, provided that all permits are granted. Mining <br />would last approximately 11 years, although the market plays a large role in the length of <br />the mining. Western Gravel LLC expects the average production from the pit is 250,000 <br />tons per year. <br />4. Facilities and Equipment <br />The site may contain: <br />- A portable screening/washing plant with a 500 gallon diesel tank <br />- A portable Asphalt plant with a 25.00 gallon diesel tank <br />- A portable Concrete plant with a 500 gallon diesel tank <br />- Portable Scales <br />- A portable office trailer <br />- A portable crusher with a 2,000 gallon diesel tank <br />- A fuel farm with a 10,000 gallon diesel tank <br />- A portable QC lab trailer <br />- A small portable shop trailer <br />Mobile equipment which will be used on site over the mine life: <br />- 1 or 2 Front end loaders <br />- 1 or 2 Bulldozers <br />- 1 Motor Grader <br />- 1 Scrapper <br />- Track hoe <br />- 1 Water truck <br />- 1 Fueling Truck <br />- Several off -road haul trucks <br />- Various 24 ton and 14 ton road haul trucks as necessary to move the permitted <br />product to market <br />