Laserfiche WebLink
•; <br />EXHIBIT D <br />Mining Plan <br />1. Geology <br />The site will mine sand and gravel deposit which is an alluvium of the recent period of <br />Quaternary age. The alluvium is relatively shallow and is underlain by the sandstones, <br />siltstones and mudstones of the Wasatch Formation. These sedimentary layers were <br />formed when uplifting Rocky Mountains to the east blocked eastward drainage during <br />Tertiary time and the Uinta Mountains blocked northward drainage and a very large lake <br />formed in northwest Colorado, northeast Utah and southwest Wyoming. This lake is <br />referred to a Lake Uinta and it received all the washout material from river floodplains <br />and deltas from the mountains on all sides of the lake. Some of the later mud which <br />entered the lake became what is now the Green River Shale, which is noted for its oil <br />content. The Green River Shale forms the hill immediately south of the permit area. Lake <br />Uinta lasted for 6,500,000 years until further uplifts drained it. <br />2. General Mining Plan <br />The gravel seam for Phase 1 is approximately 10 feet thick and is overlain by 0.5 feet of <br />topsoil and approximately 3 feet of overburden. The gravel seam for Phase 2 is <br />approximately 8 feet thick and is overlain by 0.5 feet of topsoil and approximately 6 feet <br />of overburden. For both Phase 1 and Phase 2 the mining operations (crushers, conveyors, <br />dozers and scrapers) will be located in the Westerly portion of the respective gravel pit <br />area. Utilizing dozers, scrapers and front end loaders, the topsoil will be stripped and be <br />placed in berms along the North side of the project as a buffer along the steep <br />embankment to the river valley. All topsoil piles will be seeded with a temporary seed <br />mix with a tackifier if they will be left for over 1 year without redisturbance. Weeds will <br />be controlled in all disturbed areas and on the entire site. The overburden will also be <br />removed and stockpiled. The raw gravel material will then be loaded into a crusher and <br />screening plant and/or washing plant where various sizes of product will be sorted and <br />placed in separate stockpiles. There will be no blasting as part of this operation. Mining <br />will proceed in general from the west to the east. The overburden will be replaced in the <br />bottom as the operations moves to the east. All mining and processing operations will be <br />designed to manage storm water runoff, so that no sediments flow to existing drainage. <br />To ensure that water from inside the operation does not leave the site, isolation berms <br />will be created as needed around the pit. The mining operation will proceed with side <br />slopes of 2:1. <br />It is extremely unlikely that any toxic or acid - producing materials will be encountered <br />during the mining operation since the material is alluvial in nature. However, in the event <br />that such materials are encountered, they will be covered with subsoil from the stockpiles <br />to the same depths outlined in the reclamation plan and no more mining will occur in this <br />particular area. <br />- - - - - -- - - - <br />