Laserfiche WebLink
Western Gravel E &P Waste Disposal Facility October 2011 <br />CQA/QCP Page 14 of 19 <br />MATERIAL PROPERTY <br />TEST <br />METHOD <br />REQUIRED <br />VALUES <br />Bentonite Swell Index <br />ASTM D5890 <br />24 mL /2g min. <br />Bentonite Fluid Loss <br />ASTM D5891 <br />18mL max. <br />Bentonite Mass /Area <br />ASTM D5993 <br />0.75 lb /ft <br />GCL Tensile Strength <br />ASTM D6768 <br />45 lbs /in <br />GCL Peel Strength <br />ASTM D6496 <br />3.5 lbs /in <br />GCL Index Flux <br />ASTM D5887 <br />1x10 MI/M2/sec max. <br />GCL Hydraulic Conductivity <br />ASTM D5887 I <br />5x10 cm/sec max. <br />GCL Hydrated Internal Shear Strength <br />ASTM D5321 1 <br />500 lb /ft <br />Pre - construction: <br />• The minimum acceptable dimensions of full -size GCL Panels shall be 150 feet long by 15 feet wide. <br />Shorter rolls may be supplied but must be greater than 70 feet long. The length of all short rolls must <br />be clearly marked on outer packaging <br />• A 6 -inch overlap guideline shall be imprinted on both edges of the upper geotextile component to <br />facilitate quality assurance during seam construction\ <br />• Prior to transporting any GCL to the site, the following information from manufacturer should be <br />provided to the CQA Engineer, including a copy of the project specification sheet listing all test <br />methods and property values and copies of the quality control certificates issued by the raw material <br />suppliers, the certificates shall include roll number and identification <br />• Prior to installation, a preconstruction meeting must be held. At a minimum the client, CQA <br />Engineer and the installer must be present and the installer will provide the CQA Engineer with roll <br />layout drawings. A roll numbering system and layout plan will be agreed upon by the installer and <br />the CQA Engineer that is compatible with the GCL roll numbering system. Copies of warranties for <br />the manufacturer and installer must also be provided to the CQA Engineer at this time. The GCL <br />manufacturer's quality assurance (MQA) testing requirements and frequencies are outlined in the <br />following table. <br />NWCC INC. <br />