My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-06-08_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1998-06-08_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 2:28:19 PM
Creation date
9/11/2012 7:08:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/8/1998
Doc Name
Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br /> April 1997 - March 1998 <br /> Page 6 <br /> ENGINEERING OFFICE SETTLING PONDS - Plate No. 3 <br /> This site was deeded to the San Juan County Historical Society <br /> during 1996. Use of the quonset building, metal building and <br /> topsoil stockpile area was retained by lease arrangement. <br /> Activity at this site consisted of; <br /> 1) use of the quonset building, metal building and vicinity as a <br /> staging area for projects and storage. <br /> Activity planned for 1998 includes; <br /> 1) monitoring and maintenance of vegetation. <br /> 2) use of the area as a staging area for projects and storage. <br /> INTERPRETIVE SIGN AREA - Plate No. 3 <br /> This area was removed from the permit area and Sunnyside was <br /> released from further reclamation responsibility (SR-02) . <br /> BULKHEADS - TR-14 / TR-16 <br /> Activity at this project during the 1997 reporting year consisted <br /> of; <br /> 1) the continuation of the seep, spring and flowing adit <br /> inventory required by TR-14. Twenty percent of the sites were <br /> required to be sampled and all sites monitored for field <br /> parameters twice. SGC monitored each site twice (if flow <br /> existed) and sampled more than twenty percent of the sites <br /> during the field season. Summary sheets of the data collected <br /> is included in Appendix B. <br /> 2) Implementation of the work plans for the voluntary Consent <br /> Decree agreement projects in order to fulfill the terms of the <br /> agreement and move towards final site reclamation if the terms <br /> of the Consent Decree are successfully met. Those projects <br /> were completed and inspected by October, 1997 . <br /> 3) monitoring of the bulkhead in the American Tunnel for pressure <br /> and mine pool for pH, temperature and conductivity, and <br /> inspection of the tunnel and bulkhead. <br />
The URL can be used to link to this page
Your browser does not support the video tag.