Laserfiche WebLink
Site Reclamation Activity <br /> April 1997 - March 1998 <br /> Page 5 <br /> 3) relocating the remainder of the upland diversion ditch to its <br /> final reclaimed configuration. Completion of this project <br /> provides a ditch with a 40 mil invert liner along the entire <br /> hill-side contact of Tailings Pond No.4 to capture and divert <br /> stormwater and groundwater flows around the pond. <br /> 4) placing fill along the toe of the pond to smooth contours and <br /> cap any exposed tailings that may have been exposed. <br /> This project will require additional work in 1998. <br /> 5) monitoring of the vegetation <br /> Planned activity for 1998 includes; <br /> 1) completion of the toe improvements started in 1997 . <br /> 2) monitoring and maintenance of the vegetation. <br /> TAILINGS POND #3 AREA - Plate No. 3 <br /> Activity at this site consisted of; <br /> 1) maintenance of stormwater sediment catchment. <br /> 2) monitoring and maintenance of the vegetation. <br /> Planned activity for 1998 includes; <br /> 1) monitoring and maintenance of vegetation. <br /> 2) potential improvement of drainage pathways. <br /> TAILINGS POND #1 AND TAILINGS POND #2 - Plate No. 3 <br /> Activity at this site consisted of; <br /> 1) monitoring and maintenance of the vegetation. <br /> 2) maintenance of stormwater sediment controls. <br /> Planned activity for 1998 includes; <br /> 1) monitoring and maintenance of the vegetation. <br /> 2) potential improvements to stormwater diversions. <br />