Laserfiche WebLink
Site Reclamation Activity <br /> April 1998 - March 1999 <br /> Page 5 <br /> TAILINGS POND #1 AND TAILINGS POND #2 - Plate No. 3 <br /> The Permit Technical Revision (TR-21) contained a project to <br /> improve upland runoff diversion for Tailings Pond #1. This project <br /> includes the construction of a lined diversion ditch to prevent <br /> infiltration of diverted water. <br /> Activity at this site consisted of; <br /> 1) monitoring and maintenance of the vegetation. <br /> 2) maintenance of stormwater sediment controls. <br /> 3) partial construction of a lined upland diversion ditch <br /> according to the plans approved in TR-21. <br /> Planned activity for 1999 includes; <br /> 1) monitoring and maintenance of the vegetation. <br /> 2) construction of improvements to stormwater diversions. <br /> ENGINEERING OFFICE SETTLING PONDS - Plate No. 3 <br /> This site was deeded to the San Juan County Historical Society <br /> during 1996. Use of the quonset building, metal building and <br /> topsoil stockpile area was retained by lease arrangement. <br /> The SJCHS is developing plans to create a small industrial park in <br /> this area in the future and is currently leasing the warehouse <br /> building and some of the surrounding area to small business <br /> concerns. Sunnyside may need to request a partial release of this <br /> area from the MLR permit because the plans are not consistent with <br /> the reclamation plan site usage and Sunnyside will not have any <br /> control on whether the use conversion is implemented. <br /> Activity at this site consisted of; <br /> 1) use of the quonset building, metal building and vicinity as a <br /> staging area for projects and storage. <br /> Activity planned for 1999 includes; <br /> 1) monitoring and maintenance of vegetation. <br /> 2) use of the area as a staging area for projects and storage. <br />