Laserfiche WebLink
Site Reclamation Activity <br /> April 1998 - March 1999 <br /> Page 4 <br /> Planned activity for 1999 includes; <br /> 1) refilling to grade any subsidence of the Lake Emma backfill. <br /> 2) monitoring and maintenance of the planted areas. <br /> 3) alkaline injection into the mine pool if the project is <br /> extended into the 1999 season. <br /> TAILINGS POND No.4 - Plate No. 3 <br /> During the 1998 reporting year no additional acreage was disturbed <br /> or reclaimed. A permit Technical Revision (TR-21)was submitted and <br /> approved to modify the drainage along the toe of the pond by adding <br /> a liner and providing an outlet culvert. TR-21 also included a <br /> project to extend the groundwater diversion up-gradient from the <br /> pond. <br /> Activity at this site consisted of; <br /> 1) usage for containment of material removed from the <br /> American Tunnel water treatment settling ponds and mine waste <br /> from the Consent Decree - Mine Remediation Projects. <br /> 2) monitoring and maintenance of the vegetation <br /> Planned activity for 1999 includes; <br /> 1) implementation of the water diversion plans approved in TR-21. <br /> 2) monitoring and maintenance of the vegetation. <br /> TAILINGS POND #3 AREA - Plate No. 3 <br /> Activity at this site consisted of; <br /> 1) maintenance of stormwater sediment catchment. <br /> 2) monitoring and maintenance of the vegetation. <br /> Planned activity for 1999 includes; <br /> 1) monitoring and maintenance of vegetation. <br /> 2) potential improvement of drainage pathways. <br />