My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-06-10_REPORT - M1977378 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1999-06-10_REPORT - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2021 1:19:12 PM
Creation date
9/11/2012 7:02:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/10/1999
Doc Name
Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Reclamation Activity <br /> April 1998 - March 1999 <br /> Page 4 <br /> Planned activity for 1999 includes; <br /> 1) refilling to grade any subsidence of the Lake Emma backfill. <br /> 2) monitoring and maintenance of the planted areas. <br /> 3) alkaline injection into the mine pool if the project is <br /> extended into the 1999 season. <br /> TAILINGS POND No.4 - Plate No. 3 <br /> During the 1998 reporting year no additional acreage was disturbed <br /> or reclaimed. A permit Technical Revision (TR-21)was submitted and <br /> approved to modify the drainage along the toe of the pond by adding <br /> a liner and providing an outlet culvert. TR-21 also included a <br /> project to extend the groundwater diversion up-gradient from the <br /> pond. <br /> Activity at this site consisted of; <br /> 1) usage for containment of material removed from the <br /> American Tunnel water treatment settling ponds and mine waste <br /> from the Consent Decree - Mine Remediation Projects. <br /> 2) monitoring and maintenance of the vegetation <br /> Planned activity for 1999 includes; <br /> 1) implementation of the water diversion plans approved in TR-21. <br /> 2) monitoring and maintenance of the vegetation. <br /> TAILINGS POND #3 AREA - Plate No. 3 <br /> Activity at this site consisted of; <br /> 1) maintenance of stormwater sediment catchment. <br /> 2) monitoring and maintenance of the vegetation. <br /> Planned activity for 1999 includes; <br /> 1) monitoring and maintenance of vegetation. <br /> 2) potential improvement of drainage pathways. <br />
The URL can be used to link to this page
Your browser does not support the video tag.