My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-31_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2012-08-31_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:17 PM
Creation date
9/10/2012 9:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
8/31/2012
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56, PR3, MR95, MR 97 MR101)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Twelve foot high retaining walls are necessary to keep the coal stockpile away from the 35 ton coal <br />blending bins. <br />Retaining Walls <br />Item <br />North <br />Elevation <br />East Elevation <br />Footer <br />Wall Thickness <br />12" <br />12" <br />12" <br />Face Area and Length of Footer <br />790 <br />360 <br />110 <br />Units <br />SF <br />SF <br />LF <br />Unit cost <br />7.77 <br />7.7 <br />20.59 <br />Total direct cost <br />$6,138 <br />$2,772 <br />$2,265 <br />Job supervision hours <br />2 <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />$117 <br />Profit, insurance, and bond @ 13.07% <br />$802 <br />$362 <br />$296 <br />Contract = Direct + Overhead <br />$7,058 <br />$3,251 <br />$2,678 <br />Engineering @4.25% of Contract <br />$300 <br />$138 <br />$114 <br />Reclamation management 5% of Contract <br />$353 <br />$163 <br />$134 <br />Estimated bond <br />$7,711 <br />$3,552 <br />$2,926 <br />The reclamation of the 35 ton coal blending bins is based on the outside dimensions of the <br />structure. <br />35 Ton Coal Blending Bins <br />Item <br />2 Bins <br />6 Footers <br />Width <br />30 <br />2 <br />Length <br />12 <br />4 <br />Height <br />22 <br />4 <br />Quantity <br />7920 <br />24 <br />Units <br />CF <br />LF <br />Unit cost <br />$0.2257 <br />$20.59 <br />Total direct cost <br />$1,788 <br />$494 <br />Job supervision hours <br />4 <br />4 <br />Job supervision cost <br />$234 <br />$234 <br />Profit, insurance, and bond 13.07% <br />$234 <br />$65 <br />Contract = Direct + Overhead <br />$2,255 <br />$793 <br />Engineering 4.25% of Contract <br />$96 <br />$34 <br />Reclamation management @5 % of Contract <br />$113 <br />$40 <br />Estimated bond <br />$2,464 <br />$866 <br />MR -113 Exhibit 28- Page 248 Revised 04/05/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.