Laserfiche WebLink
The reclamation of the truck loadout structure is based on the outside dimensions of the <br />structure. <br />Truck Loadout with Hoppers <br />Item <br />Structure <br />4 Footers <br />Width <br />9 <br />2 <br />Length <br />18 <br />4 <br />Height <br />22 <br />4 <br />Quantity <br />3564 <br />16 <br />Units <br />CF <br />LF <br />Unit cost <br />$0.2257 <br />$20.59 <br />Total direct cost <br />$804 <br />$329 <br />Job supervision hours <br />4 <br />4 <br />Job supervision cost <br />$234 <br />$234 <br />Profit, insurance, and bond @ 13.07% <br />$105 <br />$43 <br />Contract = Direct + Overhead <br />$1,144 <br />$607 <br />Engineering 4.25% of Contract <br />$49 <br />$26 <br />Reclamation management 5% of Contract <br />$57 <br />$30 <br />Estimated bond <br />$1,250 <br />$663 <br />The reclamation of the silo belt transfer structure is based on the outside dimensions of the <br />structure. <br />MR -113 <br />Silo Belt Transfer Structure <br />Item <br />Transfer <br />4 Footers <br />Width <br />25 <br />2 <br />Length <br />15 <br />4 <br />Height <br />22 <br />4 <br />Quantity <br />8250 <br />16 <br />Units <br />CF <br />LF <br />Unit cost <br />$0.2257 <br />$20.59 <br />Total direct cost <br />$1,862 <br />$329 <br />Job supervision hours <br />4 <br />4 <br />Job supervision cost <br />$234 <br />$234 <br />Profit, insurance, and bond @ 13.07% <br />$243 <br />$43 <br />Contract = Direct + Overhead <br />$2,340 <br />$607 <br />Engineering 4.25% of Contract <br />$99 <br />$26 <br />Reclamation management 5% of Contract <br />$117 <br />$30 <br />Estimated bond <br />$2,556 <br />$663 <br />Exhibit 28- Page 249 Revised 04/05/12 <br />