My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-31_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2012-08-31_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:17 PM
Creation date
9/10/2012 9:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
8/31/2012
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56, PR3, MR95, MR 97 MR101)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The reclamation of the truck loadout structure is based on the outside dimensions of the <br />structure. <br />Truck Loadout with Hoppers <br />Item <br />Structure <br />4 Footers <br />Width <br />9 <br />2 <br />Length <br />18 <br />4 <br />Height <br />22 <br />4 <br />Quantity <br />3564 <br />16 <br />Units <br />CF <br />LF <br />Unit cost <br />$0.2257 <br />$20.59 <br />Total direct cost <br />$804 <br />$329 <br />Job supervision hours <br />4 <br />4 <br />Job supervision cost <br />$234 <br />$234 <br />Profit, insurance, and bond @ 13.07% <br />$105 <br />$43 <br />Contract = Direct + Overhead <br />$1,144 <br />$607 <br />Engineering 4.25% of Contract <br />$49 <br />$26 <br />Reclamation management 5% of Contract <br />$57 <br />$30 <br />Estimated bond <br />$1,250 <br />$663 <br />The reclamation of the silo belt transfer structure is based on the outside dimensions of the <br />structure. <br />MR -113 <br />Silo Belt Transfer Structure <br />Item <br />Transfer <br />4 Footers <br />Width <br />25 <br />2 <br />Length <br />15 <br />4 <br />Height <br />22 <br />4 <br />Quantity <br />8250 <br />16 <br />Units <br />CF <br />LF <br />Unit cost <br />$0.2257 <br />$20.59 <br />Total direct cost <br />$1,862 <br />$329 <br />Job supervision hours <br />4 <br />4 <br />Job supervision cost <br />$234 <br />$234 <br />Profit, insurance, and bond @ 13.07% <br />$243 <br />$43 <br />Contract = Direct + Overhead <br />$2,340 <br />$607 <br />Engineering 4.25% of Contract <br />$99 <br />$26 <br />Reclamation management 5% of Contract <br />$117 <br />$30 <br />Estimated bond <br />$2,556 <br />$663 <br />Exhibit 28- Page 249 Revised 04/05/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.