My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-31_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2012-08-31_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:17 PM
Creation date
9/10/2012 9:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
8/31/2012
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56, PR3, MR95, MR 97 MR101)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A new 600 HP fan will be installed. The unusual fan duct is necessary to keep the large fan out <br />of the work area. <br />Fan and Duct Work <br />Item <br />Duct <br />Fan <br />8 Each Footings <br />Length (ft) <br />100 <br />50 <br />14 <br />Width (ft) <br />14 <br />12 <br />2 <br />Depth/Height (ft) <br />14 <br />12 <br />6 <br />Quantity <br />19600 <br />7200 <br />112 <br />Units <br />CF <br />CF <br />LF <br />Unit Cost <br />$0.2257 <br />$0.2257 <br />20.59 <br />Total direct cost <br />$4,424 <br />$1,625 <br />$2,306 <br />Job supervision hours <br />4 <br />4 <br />4 <br />Job supervision cost <br />$234 <br />$234 <br />$234 <br />Profit, insurance, and bond 13.07% <br />$578 <br />$212 <br />$301 <br />Contract = Direct + Overhead <br />$5,236 <br />$2,072 <br />$2,842 <br />Engineering 4.25% of Contract <br />$223 <br />$88 <br />$121 <br />Reclamation management 5% of Contract <br />$262 <br />$104 <br />$142 <br />Estimated bond <br />$5,720 <br />$2,263 <br />$3,105 <br />Three conveyors will be installed. A temporary belt will extend from the 35 ton coal blending <br />bins to the truck loadout with hoppers. Silo #1 belt will be suspended under the silos. Silo #2 <br />belt will take coal from Silo #1 belt and discharge into the truck loadout with hoppers. <br />Conveyors <br />Item <br />42" Belt <br />Temp <br />42" Silo #1 <br />42" Silo #2 <br />Length (ft) <br />115 <br />165 <br />56 <br />Width (ft) <br />3.5 <br />3.5 <br />3.5 <br />Depth/height (ft) <br />3 <br />3 <br />3 <br />Quantity <br />115 <br />165 <br />56 <br />Units <br />LF <br />LF <br />LF <br />Unit cost <br />41.31 <br />41.31 <br />41.31 <br />Total direct cost <br />$4,751 <br />$6,816 <br />$2,313 <br />Job supervision hours <br />2 <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />$117 <br />Profit, insurance, and bond @ 13.07% <br />$621 <br />$891 <br />$302 <br />Contract = Direct + Overhead <br />$5,489 <br />$7,824 <br />$2,733 <br />Engineering 4.25% of Contract <br />$233 <br />$333 <br />$116 <br />Reclamation management 5% of Contract <br />$274 <br />$391 <br />$137 <br />Estimated bond <br />$5,996 <br />$8,548 <br />$2,986 <br />MR -113 Exhibit 28- Page 247 Revised 04/05/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.