Laserfiche WebLink
New Elk Coal Company <br />Permit C- 1981 -012 <br />TRUCK LOADING SYSTEM & FAN <br />MR -113 provides for the construction of a truck loading system to facilitate coal blending. The <br />temporary truck loading system is comprised of two 35 ton coal blending bins and a beltline to covey the <br />coal from the bins to a truck loadout with hoppers. Twelve foot high retaining walls are necessary to <br />keep the coal stockpile away from the loading bins. The permanent truck loading system is comprised of <br />a beltline located under the silos and a beltline to the truck loadout with hoppers. <br />MR -113 also provides for the installation of a 600 HP ventilation fan and ducting. The <br />ventilation fan permitted with the bates portal will be replaced by the 600 HP fan. <br />fan. <br />This document estimates the bonding required to removed the truck loading system and <br />MR -113 Truck Loading System & Fan <br />Total direct cost <br />$39,017 <br />Job supervision hours <br />48 <br />Job supervision cost <br />$2,811 <br />Profit, insurance, bond <br />$5,100 <br />Contract <br />$46,928 <br />Engineering <br />$1,994 <br />Reclamation management <br />$2,346 <br />Estimated bond <br />$51,268 <br />MR -113 Exhibit 28- Page 246 Revised 04/05/12 <br />