Laserfiche WebLink
AREA <br />YEARS <br />TOTAL AREA <br />(ACRES) <br />MINED AREA AVERAGE YEARLY <br />(ACRES) 1 PRODUCTION (TONS) <br />Stage I <br />25 -33 <br />24.95 <br />21.84 70,000 <br />Stage II <br />9 -11 <br />14.66 <br />10.16 ' 70,000 <br />Plant site <br />LIFE OF <br />MINE <br />7.22 <br />0.00 <br />0 <br />Totals <br />46.83 <br />32.00 <br />MINING PLAN <br />MINING TIMETABLE. <br />The continuing uncertainty of economic conditions in the <br />construction materials industry precludes an accurate forecast of <br />demand during the life of the mine. We therefore, elect to <br />estimate the mining timetable based on an average yea' and expect <br />a specific year to vary widely from the average. <br />Table D -1 MINING TIMETABLE <br />12 <br />EXHIBIT D (cont) <br />