My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-31_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2012-08-31_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:19 PM
Creation date
9/6/2012 10:46:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
8/31/2012
Doc Name
Revised Bond Release
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
SL4
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brock Bowles <br />2. Permittee: Bowie Resources LLC <br />3. Permit No. C- 1981 -038 <br />4. Date Permit was approved: <br />Initial Permanent Program Permit Issuance September 24, 1981 <br />Current Permit Issued April 20, 2008 <br />5. Mine Name: Bowie No. 1 Mine <br />6. Phase of Bond Release Requested: Partial Phase I <br />7. Number of Acres: Total: 70.0 Ac. <br />2008 Reclamation Activities: <br />Zones Description Topsoiled Reseeded Acreage <br />Zone 1A Crushing & Screening Level Fill Yes Yes 5.93Ac. <br />Zone 1B Shop & Warehouse Level Fill Yes Yes 3.11 Ac. <br />Zone 10 Fan Bench Yes Yes 2.97 Ac. <br />Zone 1D Substation Level Fill Yes Yes 0.34 Ac. <br />Zone 2B Portal Level Fill No No 0.14Ac. <br />Zone 3A Diversion Channel Cut Yes Yes <br />Zone 3B Diversion Channel Cut Yes Yes <br />Zone 3C Diversion Channel Cut Yes Yes 6.98 Ac. <br />Zone 4A Rock Cut above Crushing & Screening Yes Yes 1.42 Ac. <br />Zone 4D Rock Cut below Fan Level Yes Yes 3.65 Ac <br />Zone 5A Waste Rock Disposal Site Yes No 7.04 Ac. <br />Zone 6A R.O.M. Coal Stockpile & Access Road Yes Yes 10.71 Ac. <br />Total 42.29 Ac. <br />2009 Reclamation Activities: <br />Zones Description Topsoiled Reseeded Acreage <br />Zone 4C Portal Bench No Yes 4.54 Ac. <br />Zone 2E Substation /Access Road Yes Yes 0.18 Ac. <br />Zone 2D Access Road No Yes 0.61 Ac. <br />Zone 1 E Belt Transfer Yes Yes 0.35 Ac. <br />Zone 2A Shop/Warehouse Yes Yes 2.15 Ac. <br />Zone 4B Storage Bench No Yes 1.27 Ac. <br />Zone 2C Access Road No Yes 0.93 Ac. <br />Asphalt Removal /Narrowing of Road No Yes 4.20 Ac <br />Total 14.23 Ac. <br />Areas not included in Annual Reclamation Activities, but included in Phase I request: <br />Zone 5 Borrow Area No No 3.52 Ac. <br />Haul Road cut /Fill No Yes 9.96 Ac. <br />Total 13.48 Ac. <br />8. Bond Company: Lexon Insurance Company <br />- 2 - August 28, 2012 <br />9. Bond: Number: Corporate Surety, Bond No. 1071400, $2,500,000 <br />Corporate Surety, Bond No. 1071399, $2,500,000 <br />Corporate Surety, Bond No. 1071398, $761,290 <br />
The URL can be used to link to this page
Your browser does not support the video tag.