Laserfiche WebLink
Brock Bowles <br />10. Current Total Bond Amount: $4,624,936.00 posted <br />11. Original Total Bond Amount: 1981 East Mine Bond - $1,116,500 <br />1986 West Mine Bond - $1,025,000 <br />12. Dollar Amount Requested for Release: $ 1,274,400 <br />13. Legal Description of Area Requested: Portions of: <br />Township 13 South Range 92 West, 6 P.M. <br />Section 24: NW /4SE /4, SW /4NE /4 <br />14. A Map Showing Area: Figure 1 is Enclosed <br />15. Dates Reclamation Work Performed: 2008 and 2009 <br />16. A description of results achieved: During 2008 partial reclamation of the Bowie No. 1 East Mine <br />was performed. (The 2008 reclamation is a continuation of the 2001 activities in which surface <br />structures were removed). The 2008 reclamation consisted of returning portions of the disturbed <br />area back to approximate original contours and hydro seeding with a permanent seed mix and <br />wood fiber mulch. <br />All reclamation work has been performed in accordance with plans approved by the Division of <br />Reclamation Mining and Safety. <br />17. Copies of the written notice to seek release to parties identified in Rule 3.03.2(1): <br />A Certificate of Service which documents the notices required under Rule 3.03.2(1) have been <br />mailed and was included as part of initial bond release application dated March 12, 2012. <br />18. Copy of newspaper advertisement: Proof of publication of the public notice of the partial bond <br />release was sent to DRMS April 23, 2012. <br />Please call if you have any questions. <br />Sincerely, <br />J. LStover, P.E. <br />Consulting Engineer <br />Enclosure: <br />Figure 1 <br />- 3 - August 28, 2012 <br />During 2009 final grading of the Bowie #1 East Mine was completed (excluding required sediment <br />control structures). The 2009 activities which were a continuation of the 2008 activities, included <br />the final grading and hydro seeding with an approved permanent seed mix, and mulched with a <br />wood fiber mulch. <br />