Laserfiche WebLink
Table C <br /> AMERICAN TUNNEL <br /> Task Parameters When Done Comments <br /> Trash Segregation, Per Plans Given in Beginning 1987 (1) <br /> Signs, Clean-up and Exhibits D and E of During Operations. <br /> Burial of Refuse, the Application. <br /> Reclamation. <br /> Create Drainage Swale Refer to Tables During Operations on Road, Drainage G-2, G-3 in <br /> Ditches, Maintain Application for <br /> Existing Culverts. Design <br /> Analyzes of Seepage at Refer to Table I During 1987 (2) <br /> Toe of Refuse Pile and (Attached) for <br /> Natural Seepage to S. Parameters. <br /> of Pile <br /> NPDES Monitoring Per NPDES Permit Per NPDES Permit - <br /> and Water Treatment. <br /> Water Treatment Ponds Approx. 1.5 ft. During Opration (3) <br /> Freeboard <br /> (1) The existing approved plan implies that grading to 2:1 slopes, <br /> covering with 1.5 feet of borrow, seeding of a major portion of <br /> the refuse dump, less a new cell located on the west side of the <br /> pile, will occur in 1987. The plan states that, following mine <br /> rehabilitation, refuse generation is expected to be minor and that <br /> new debris will be disposed of at the site on Tailing Pond No. 1. <br /> (2) The number of samples to be taken is not specified. <br /> (3) Freeboard desired above the operational water surface to contain <br /> the 100-yr. precipitation event. <br /> -3- <br />