My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-07-16_GENERAL DOCUMENTS - M1977378
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977378
>
1987-07-16_GENERAL DOCUMENTS - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/1/2021 6:18:47 PM
Creation date
8/29/2012 7:49:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/16/1987
Doc Name
Monitoring/Reclamation Commitments During Mining Operations.
From
Sunnyside Gold Corp
To
MLRD
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table B <br /> TERRY TUNNEL <br /> Task Parameters When Done Comments <br /> Trash Segregation, - During Operations (1) <br /> Signs, Clean-up and <br /> Burial of Refuse. <br /> Install 18" Culvert Control Dump During Operations - <br /> From Flume to Stream, Erosion. Details <br /> Riprap Culvert Outlet. in Appendix 2-B. <br /> Revetation Plot Species Mix Per During Operations (2) <br /> Table E-3 in <br /> Application <br /> NPDES Monitoring Per NPDES Permit Per NPDES Permit - <br /> and Water Treatment. <br /> Water Treatment Ponds Approx. 1.5 ft. During Operation (3) <br /> Freeboard <br /> (1) The plan states that, following mine rehabilitation, refuse <br /> generation is expected to be minor and that new debris will be <br /> disposed of at the site on Tailing Pond No. 1. The refuse <br /> trenches are to be covered with two feet of earth. <br /> (2) A trial planting is to occur on the waste rock on the easterly <br /> side of the site. Not specified when the trial will be <br /> implemented. <br /> (3) Freeboard desired above the operational water surface to contain <br /> the 100-yr. precipitation event. If a nominal 1.0 ft. of freeboard <br /> above the maximum water surface is maintained, approximately 18 <br /> inches (1.5 ft.) between the operational water surface of the two <br /> ponds and the crest of the road will provide adequate storage of <br /> the design storm. <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.