Laserfiche WebLink
Table A <br /> LAKE EMMA <br /> Task Parameters When Done Comments <br /> Begin Lake Backfill Details Given in Begin Fall (1) <br /> and Reclamation and Exhibit E of 1987 <br /> Construction of Clay Application. <br /> Cover and Rock Mulch <br /> Cover. <br /> Monitor Fill for - Annually (2) <br /> Settling - <br /> Salvage Soil Encountered During Construction (3) <br /> During Disturbance. <br /> Vegetation Test Plot Refer to Table Begin Summer (4) <br /> on Lake-sediments Pile. E-2 of Application 1987 <br /> for Details. - <br /> Permit Modification Where Overburden to During Operations <br /> Width of Workings <br /> Ratio is Less than 5. <br /> NPDES Monitoring Per NPDES Permit Per NPDES Permit - <br /> (1) The plan states that additional information regarding the work plans <br /> will be submitted to the MLRD prior to commencing backfilling. <br /> (2) The fill is designed to be a free draining surface. The site is to <br /> be monitored for settling after backfill has been placed tt ensure <br /> that drainage will be permanent. To be inspected annually and <br /> maintained as appropriate. <br /> (3) The plan states that all soil encountered as part of the disturbance <br /> created will be salvaged for use in reclamation. And, in the case <br /> where a borrow source is removed and exposes soil, the soil will be <br /> reseeded. <br /> (4) To be evaluated over a 3-yr. period. If plots are successful, <br /> additional lake muds to be placed over fill surface to be used <br /> like a soil and the medium reseeded. <br /> -1- <br />