My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-07-16_GENERAL DOCUMENTS - M1977378
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977378
>
1987-07-16_GENERAL DOCUMENTS - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/1/2021 6:18:47 PM
Creation date
8/29/2012 7:49:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/16/1987
Doc Name
Monitoring/Reclamation Commitments During Mining Operations.
From
Sunnyside Gold Corp
To
MLRD
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table A <br /> LAKE EMMA <br /> Task Parameters When Done Comments <br /> Begin Lake Backfill Details Given in Begin Fall (1) <br /> and Reclamation and Exhibit E of 1987 <br /> Construction of Clay Application. <br /> Cover and Rock Mulch <br /> Cover. <br /> Monitor Fill for - Annually (2) <br /> Settling - <br /> Salvage Soil Encountered During Construction (3) <br /> During Disturbance. <br /> Vegetation Test Plot Refer to Table Begin Summer (4) <br /> on Lake-sediments Pile. E-2 of Application 1987 <br /> for Details. - <br /> Permit Modification Where Overburden to During Operations <br /> Width of Workings <br /> Ratio is Less than 5. <br /> NPDES Monitoring Per NPDES Permit Per NPDES Permit - <br /> (1) The plan states that additional information regarding the work plans <br /> will be submitted to the MLRD prior to commencing backfilling. <br /> (2) The fill is designed to be a free draining surface. The site is to <br /> be monitored for settling after backfill has been placed tt ensure <br /> that drainage will be permanent. To be inspected annually and <br /> maintained as appropriate. <br /> (3) The plan states that all soil encountered as part of the disturbance <br /> created will be salvaged for use in reclamation. And, in the case <br /> where a borrow source is removed and exposes soil, the soil will be <br /> reseeded. <br /> (4) To be evaluated over a 3-yr. period. If plots are successful, <br /> additional lake muds to be placed over fill surface to be used <br /> like a soil and the medium reseeded. <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.