Laserfiche WebLink
Table D <br /> TAILING PONDS NOS. 1 and 2 <br /> Task Parameters When Done Comments <br /> Continue Vegetation Plot Refer to Appendix During Operations <br /> Studies. 3 and Exhibit E. <br /> of Application. <br /> Inspect/Maintain Accum. of Debris, Annually (1) <br /> Upslope Diversion. Growth of Trees, <br /> Presence of Erosion. <br /> Sample Boulder Creek Refer to Table I Apr./Oct. (2) <br /> Upstream and Downstream (Attached) for <br /> from Tailing Ponds. Parameters.Construct Drift Fences, Control Tailing During Operations - <br /> Use Coherex, Vegetation Entering Boulder <br /> Trials (outslopes) on Creek. <br /> Pond No. 2. <br /> Trash Segregation, Signs, - During Operations - <br /> Fencing, Phased Burial <br /> of Refuse on Pond No. 1. <br /> (1) Vegetation with a base diameter greater than one inch to be removed. <br /> Other maintenance to be done as necessary. <br /> (2) Data to be submitted to the MLRD with company's annual report. <br /> w {4 <br /> �P it I tF <br /> -4- <br /> - t <br /> I <br />