My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-05-31_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1988-05-31_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2021 6:27:01 AM
Creation date
8/28/2012 11:27:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Report
Doc Date
5/31/1988
Doc Name
Annual Report- April 1987 to March 1988
From
Sunnyside Gold Corp
To
MLRD
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
feeding a continuous milk of lime slurry to the renovated mix tank in <br /> the existing reagent building. A liquid flocculant system was also <br /> installed with 6000 gallons of storage . The Polybiend flocculant <br /> mixer/feeder is capable of feeding any concentrat:Dn of flocculant to <br /> the mix tank on a continuous basis . Roughly one year of storage of <br /> liquid reagent is available . A 16 inch inlet pipeline replaces the <br /> previous two eight inch inlet lines to the mix tank. <br /> All four settling ponds were cleaned during May 1987 and October <br /> 1987 . Roughly 3 . 5 million gallons of sludge/water was pumped from <br /> the ponds with the Mud Cat Lagoon Dredge into 80 barrel ( 3000 gallon) <br /> vacuum water trucks for haulage to Tailings Pond No. 3 and disposal . <br /> At all times at least two feet of freeboard is available in each <br /> settling pond. <br /> A new 24 inch outlet spillway was installed in settling pond no. <br /> 4 -�o replace the old decayed spillway. To prevent the discharge of <br /> fluting solids , a 24 inch CMP T, oriented vertically, was added to <br /> the spillway inlet. <br /> Considerable upgrading to the snow shed has also been <br /> accomplished including repair of siding and graveling the snow shed <br /> floor. A second rock dump for waste material is being added <br /> immediately to the south of the existing ore dump. This will <br /> facilitate removal of waste rock and , low grade ore from the mine. <br /> Activities planned for 1988 include sampling the newly deposited <br /> waste to determine acid production potential, and continued <br /> semi-annual settling pond clean-out. Also, a new 16 inch outlet <br /> pipeline will be installed from the reagent building, running 100 <br /> feet to a manhole where connection to the twin 10 inch bypass lines <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.