Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 025 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />1 <br />(Ft) <br />-8.00 <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 1,371.78 <br />Adjusted single truck/loader team production: 975.88 <br />Adjusted multiple truck/loader team production: 975.88 <br />min <br />1 <br />2630.00 <br />8.00 <br />5.00 <br />13.00 <br />620 <br />4.286 <br />Return Route: <br />Haul Time: <br />4.286 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />2630.00 <br />-8.00 <br />5.00 <br />-3.00 <br />3503 <br />0.789 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.246 /LCY <br />minutes <br />minutes <br />minutes <br />975.88 LCY/Hour <br />342.95 LCY /Hour <br />4 Truck(s) <br />LCY /Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 4,048.82 Hours <br />Total job cost: $7,032,148.28 <br />CIRCES Cost Estimating Software <br />Return Time: 0.789 <br />Total Truck Cycle Time: 9.675 <br />Loading Tool unit <br />Production <br />1,235.29 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />434.11 LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 1,371.78 <br />Adjusted single truck/loader team production: 975.88 <br />Adjusted multiple truck/loader team production: 975.88 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.246 /LCY <br />minutes <br />minutes <br />minutes <br />975.88 LCY/Hour <br />342.95 LCY /Hour <br />4 Truck(s) <br />LCY /Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 4,048.82 Hours <br />Total job cost: $7,032,148.28 <br />CIRCES Cost Estimating Software <br />