Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade BC Road <br />Site: Trapper Mine Permit Action: RN6 Permit/Job #: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: 030 <br />Date: 8/9/2012 <br />User: JLE <br />State: <br />County: <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: COIO -030 <br />Total unit Cost/Hour: $322.48 <br />Total Fleet Cost/Hour: $1,289.92 <br />MATERIAL QUANTITIES <br />Initial Volume: 90,015 <br />Swell factor: 1.250 <br />Loose volume: 112,519 LCY <br />Source of estimated volume: Appendix A, Table 1.4 -5 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />80 feet <br />2,028.0 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />6,400 feet <br />2,550 lbs /LCY <br />Weight description: Earth - Dry <br />packed <br />Utilization % <br />Ownership Cost/Hour: <br />$102.22 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $322.48 <br />Total Fleet Cost/Hour: $1,289.92 <br />MATERIAL QUANTITIES <br />Initial Volume: 90,015 <br />Swell factor: 1.250 <br />Loose volume: 112,519 LCY <br />Source of estimated volume: Appendix A, Table 1.4 -5 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />80 feet <br />2,028.0 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />6,400 feet <br />2,550 lbs /LCY <br />Weight description: Earth - Dry <br />packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />