My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-21_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2012-08-21_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:37 PM
Creation date
8/22/2012 7:57:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
8/21/2012
Doc Name
Preliminary Adequacy Review & Cost Estimate
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
RN6
Email Name
JLE
SB1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd <br />Task # 025 Page 2 of 3 <br />Truck Bed (volume) Basis: <br />Source <br />Material: <br />Struck Volume: <br />60.60 <br />LCY <br />Heaped Volume: <br />78.80 <br />LCY <br />Average Volume: <br />69.70 <br />LCY <br />Adjusted Volume: <br />78.80 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 70.00 LCY <br />Loading Tool Capacity <br />(Cat HB) <br />Dump Target: <br />No adjustment - factor no applicable 0. 00 <br />0.000 <br />Bucket Size Class: NA <br />Rated Capacity: <br />16.000 <br />LCY (heaped) <br />Bucket Fill Factor: <br />0.875 <br />Blasted rock - well blasted (80 - 95 %) 0.875 <br />Adjusted Capacity: <br />14.000 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 6400 feet <br />Net Correction: 0.790 0.790 <br />Loadiny, Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.625 minutes <br />Cycle Time Factors <br />Net Cycle Time Adjustment: 0.000 <br />Factor (min.) <br />Source <br />Material: <br />No adjustment - factor not applicable 0.00 <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.790 <br />0.790 <br />(CAT HB) <br />Net Correction: 0.790 0.790 <br />Loadiny, Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.625 minutes <br />Cycle Time Factors <br />Net Cycle Time Adjustment: 0.000 <br />Factor (min.) <br />Source <br />Material: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Stockpile: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Dump Target: <br />No adjustment - factor no applicable 0. 00 <br />0.000 <br />(Cat HB) <br />5 passes <br />CIRCES Cost Estimating Software <br />Net Cycle Time Adjustment: 0.000 <br />minutes <br />Adjusted Loader Cycle Time: 0.625 <br />minutes <br />Net Load Time per Truck: 2.600 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.80 <br />Minutes Adjusted for site altitude: <br />0.800 Minutes <br />Truck Load Time: 2.600 <br />Minutes Adjusted for site altitude: <br />2.600 Minutes <br />Truck Maneuver and Dump Time: 1.20 <br />Minutes Adjusted for site altitude: <br />1.200 Minutes <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />5 passes <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.