Laserfiche WebLink
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Regrade K -Pit Truck Loader Costs <br />Site: Trapper Mine Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: 025 State: Colorado <br />Date: 8/9/2012 County: Moffat <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />ipti <br />Truck Loader Team - Truck: Cat 777F <br />- Loader: CAT 992K high lift <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D10T - IOSU <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 2,500 Gal. <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Fouinment <br />Total work team cost/hour: $1,736.84 <br />MATERIAL OUANTITIES <br />Initial volume: 5,644,528 CCY Swell factor: 1.000 <br />Loose volume: 5,644,528 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Operator Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,475 Pounds /LCY <br />Description: User Provided <br />Rated Payload: 200,000 Pounds <br />Payload Capacity: 80.81 LCY <br />Abbreviation: None <br />Filename: COIO -025 <br />Permit/Job #: C1981010 <br />Shift basis: 3 per day <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />70 <br />100 <br />NA <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$58.69 <br />$181.20 <br />NA <br />$102.22 <br />$65.27 <br />$7.69 <br />Operating cost/hour: <br />$126.20 <br />$211.60 <br />NA <br />$181.78 <br />$44.86 <br />$10.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.54 <br />$38.67 <br />NA <br />$38.49 <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$207.43 <br />$431.47 <br />NA <br />$322.48 <br />$134.59 <br />$18.58 <br />Number of Units: <br />4 <br />1 <br />0 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $1,261.19 <br />Support: $322.48 <br />Maint: $153.17 <br />Total work team cost/hour: $1,736.84 <br />MATERIAL OUANTITIES <br />Initial volume: 5,644,528 CCY Swell factor: 1.000 <br />Loose volume: 5,644,528 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Operator Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,475 Pounds /LCY <br />Description: User Provided <br />Rated Payload: 200,000 Pounds <br />Payload Capacity: 80.81 LCY <br />Abbreviation: None <br />Filename: COIO -025 <br />Permit/Job #: C1981010 <br />Shift basis: 3 per day <br />CIRCES Cost Estimating Software <br />