My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-02-23_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
2001-02-23_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2021 3:17:54 PM
Creation date
8/10/2012 10:52:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
2/23/2001
Doc Name
January, 2001 Monthly Report
From
Sunnyside Gold Corp.
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January Monthly Report - 2001 <br /> Page 3 <br /> Cement Creek Diversion and Water Treatment <br /> Cement Creek diversion and water treatment was active throughout January. The entire <br /> Cement Creek flow was diverted for treatment and all of the American Tunnel flow was <br /> treated throughout the month. <br /> The January 2001 monitoring results for; dissolved metals in the AT-004 discharge; <br /> Cement Creek (CC-1B); American Tunnel flow before treatment (AT-INFEL); and <br /> Cement Creek below the AT-004 discharge point (CC-20) are attached. <br /> Mainstem Stream Monitoring and Reference Point Stream Monitoring <br /> Sunnyside sampled the reference point (A-72) on January 3' . The results for this sample <br /> are attached. <br /> The provisional flow at A-72 on January 3, 2001 was 68 cfs, which places this sample <br /> result in the low flow category (Q<100cfs). The dissolved zinc value for this sample, <br /> obtained by averaging the results from two labs, was 769 ug/l. Because the results from <br /> the two labs varied more than normal, this result is preliminary and might change if the <br /> results change after the labs rerun their samples. <br /> The preliminary index number for the January sample is calculated as follows: <br /> Xi = 769 <br /> Xf= 519 <br /> Sf= 124 <br /> Ni = (Xi — Xf) /Sf <br /> Ni = (769— 519) /124 <br /> Ni = +2.01 <br /> The index number graph and updated reporting table are attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.