January Monthly Report - 2001 <br /> Page 2 <br /> work planned for these sites. During January, Sunnyside did not work on any of these <br /> sites. <br /> Snow now covers these sites and they will not be visited again until spring. <br /> • Sunnyside Mine Pool Mitigation—Alkaline Solution Injection <br /> This project was not active in January of 2001 and with the establishment of mine pool <br /> equilibrium, it is unlikely SGC will plan to add additional alkaline material to the mine <br /> pool. <br /> "B List" Projects <br /> • Columbus Mine Portals— Mine Waste Dumps <br /> • London Mine Portals—Waste Dumps <br /> Work, permitting or arrangement for access is not planned until it becomes evident that <br /> the work plans for these projects require implementation. <br /> • Mayflower Facility— Upland Hydrological Control <br /> This project was completed in October, 1999 and accepted by DMG as complying with <br /> the Consent Decree work plans and MLR Standards in November, 1999. <br /> These diversions were covered with snow and were not inspected during January. <br /> • Tailings Pond No. 4 Surface Drainage Modification <br /> This project was completed in November, 1999 and accepted by DMG as complying with <br /> the Consent Decree work plan and MLR Standards. <br /> This site was covered with snow in January and was not inspected. <br /> • Tailings Pond No. 4 Upland Groundwater Diversion <br /> This area was covered with snow and was not inspected in January. <br />