Laserfiche WebLink
BUCKLEN EQUIPMENT CO <br />BUCKLEN EQUIPMENT CO PIT — ID# M- 1982 -131 Technicai Revision <br />All grading and topsoiling of pond shores will be done as soon as practicable by the Operator. <br />The proposed timetables will be followed as long as mining keeps up with market conditions. The <br />operator will reclaim based on keeping the Table of Disturbance within the limits set in the Mining <br />Plan. <br />There is no acid forming material associated with the mining operation and any refuse will be <br />disposed of in an appropriate manner. <br />There are no drill holes or auger holes associated with the project. <br />The maximum slope in the lake will be a 3H: 1V. <br />WATER <br />The disturbances to the hydrologic balance will be minimized by the operator. The amended land <br />will be mined in the same manner as the existing mine site. The operator commits to: <br />1. Comply with all applicable Colorado Water Laws and regulations governing the injury of water <br />rights. <br />2. Comply with applicable Federal and State water quality regulations. <br />3. Comply with any requirements of the Clean Water Act and any requirements that maybe <br />imposed by the Section 404 Dredge and Fill permits. <br />4. There are no temporary siltation structures associated with the project, except for settling <br />ponds permitted under the NPDES Permit. <br />5. There are no engineered earthen dams to be constructed to impound water. <br />WILDLIFE <br />The mine site is situated along the Cache la Poudre River. The river serves as a corridor for <br />wildlife and numerous species have been sighted as is evidenced by the Colorado Division of <br />Wildlife. The habitat is mainly confined in other areas adjacent to the property and the mining of <br />the land in the amendment will not impact the corridor adversely. The creation of a new lake will <br />positively impact the area by the creation of new riparian habitat and the addition of new wetlands <br />along the shoreline. <br />TOPSOILING <br />All topsoil removed from the site will be segregated and stockpiled for reclamation. All stockpiles <br />will be revegetated to prevent wind and water erosion. The material will be placed on the site <br />such that any erosion that may occur will be confined to the property. <br />Page 5 of 12 <br />