My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-27_REVISION - C1992081 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-07-27_REVISION - C1992081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:09 PM
Creation date
7/31/2012 11:02:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
7/27/2012
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil on Rail Spur <br />Site: Hayden Gulch Loadout Permit Action: SL1 Permit/7ob#: 01992081 <br />PROJECT IDENTIFICATION <br />Task #: 025 State: Colorado <br />Date: 6/15/2012 County: Routt <br />User: 3LE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: <br />Cat <br />- Dozer: <br />NA <br />Support Equipment -Load Area: <br />NA <br />-Durn Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />rust lArvakrinvvn- SrranPr Wnrk Tagm <br />Abbreviation: None <br />Filename; 0081 -025 <br />COSTShift basis: 1 per day <br />Crennnrt Fmrinrrrnnr ABn nrn a !~., ...� <br />Total work team cost/hour: $723.24 <br />MATERIAL OUANTITIES <br />Initial volume: 6,714 CCY Swell factor: 1.125 <br />Loose volume: 7,553 LCY <br />Source of estimated volume. Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$232.77 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$723,24 <br />Support: <br />$0.00 <br />Maint: <br />$0,00 <br />Total work team cost/hour: $723.24 <br />MATERIAL OUANTITIES <br />Initial volume: 6,714 CCY Swell factor: 1.125 <br />Loose volume: 7,553 LCY <br />Source of estimated volume. Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Wware <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2.5501bs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Wware <br />
The URL can be used to link to this page
Your browser does not support the video tag.