My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-27_REVISION - C1992081 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-07-27_REVISION - C1992081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:09 PM
Creation date
7/31/2012 11:02:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
7/27/2012
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 025 Page 2 of 2 <br />Cale Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction:. <br />1.00 Minutes <br />0.60 Minutes <br />Net Correction: I 0.830 1 NA <br />Site Altitude: 6400 feet <br />Travel Time: <br />Road Condition: Rutted dirt little maintenance no water, I" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />source <br />Altitude Ad': <br />1.000 <br />NA <br />CAT HH <br />Job Efficiency: <br />0.830 <br />NA <br />CAT HB) <br />Net Correction: I 0.830 1 NA <br />Site Altitude: 6400 feet <br />Travel Time: <br />Road Condition: Rutted dirt little maintenance no water, I" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />OFD) <br />Roll. Res Total Res <br />% % <br />Velocity (fpm) <br />Travel Time <br />(Wn) <br />1 <br />7200.00 <br />3.00 <br />4.00 7.00 <br />1362 <br />-5.36 <br />Haul Time: 536 minutes <br />Return Route- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />`Travel Time <br />l <br />7200.00 <br />-3.00 <br />4.00 <br />1.00 <br />2963 <br />2.55 <br />Return Time: <br />2.55 <br />minutes <br />Total Scraper team cycle time: <br />9.51 <br />minutes <br />Adjusted for job conditions: <br />303.72 <br />LCYIHour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />303.72 <br />LCYIHour <br />Adjusted multiple scraper team (fleet) hourly production: <br />303.71 <br />LCYIHour <br />Unadjusted unit production/hour: 365.93 LCYIHour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: l Team(s) Total job time: <br />24.87 Hours <br />Unit cost: $2.381 ILCY Total job cost: $17,986.20 <br />CIRCES Cost Estimating 5uftwam <br />
The URL can be used to link to this page
Your browser does not support the video tag.