Laserfiche WebLink
Scraper Worksheet Cont'd Task # 024 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.40 Minutes <br />0.60 Minutes <br />Site Altitude: 6400 feet <br />Net Correction: 0,830 I NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, l" tire penetration 4.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) Travel Time <br />°CQ % % (min) <br />1 2000.00 3.00 4.00 7.00 1362 1.54 <br />Haul Time: 1.54 minutes <br />Return Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Total Res <br />% <br />AItitude Ad': <br />1.000 <br />NA <br />CAT HB) <br />Job Efficiency: <br />0,830 <br />NA <br />CAT H$) <br />Net Correction: 0,830 I NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, l" tire penetration 4.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) Travel Time <br />°CQ % % (min) <br />1 2000.00 3.00 4.00 7.00 1362 1.54 <br />Haul Time: 1.54 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />°fn <br />Roll. Res <br />% <br />Total Res <br />% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />73496 <br />1 <br />2000.00 <br />-3.00 <br />4.00 <br />1.00 <br />2963 <br />0.79 <br />Adjusted multiple scraper team (fleet) hourly production: <br />Return Time: <br />0.79 <br />minutes <br />Total Scraper team cycle time: <br />393 <br />minutes <br />Adjusted for job conditions: <br />73496 <br />LCY /Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />734.96 <br />LCYiHour <br />Adjusted multiple scraper team (fleet) hourly production: <br />734.96 <br />LCYIHour <br />Unadjusted unit production/hour: 885.50 LCY1Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total jab time: 122.73 Hours <br />Unit cost: $0.984 /LCY Total job cost: $88,763.87 <br />CiRCES Cost Estimating Software <br />