My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-27_REVISION - C1992081 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-07-27_REVISION - C1992081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:09 PM
Creation date
7/31/2012 11:02:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
7/27/2012
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 024 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.40 Minutes <br />0.60 Minutes <br />Site Altitude: 6400 feet <br />Net Correction: 0,830 I NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, l" tire penetration 4.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) Travel Time <br />°CQ % % (min) <br />1 2000.00 3.00 4.00 7.00 1362 1.54 <br />Haul Time: 1.54 minutes <br />Return Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Total Res <br />% <br />AItitude Ad': <br />1.000 <br />NA <br />CAT HB) <br />Job Efficiency: <br />0,830 <br />NA <br />CAT H$) <br />Net Correction: 0,830 I NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, l" tire penetration 4.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) Travel Time <br />°CQ % % (min) <br />1 2000.00 3.00 4.00 7.00 1362 1.54 <br />Haul Time: 1.54 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />°fn <br />Roll. Res <br />% <br />Total Res <br />% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />73496 <br />1 <br />2000.00 <br />-3.00 <br />4.00 <br />1.00 <br />2963 <br />0.79 <br />Adjusted multiple scraper team (fleet) hourly production: <br />Return Time: <br />0.79 <br />minutes <br />Total Scraper team cycle time: <br />393 <br />minutes <br />Adjusted for job conditions: <br />73496 <br />LCY /Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />734.96 <br />LCYiHour <br />Adjusted multiple scraper team (fleet) hourly production: <br />734.96 <br />LCYIHour <br />Unadjusted unit production/hour: 885.50 LCY1Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total jab time: 122.73 Hours <br />Unit cost: $0.984 /LCY Total job cost: $88,763.87 <br />CiRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.