My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-27_REVISION - C1992081 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-07-27_REVISION - C1992081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:09 PM
Creation date
7/31/2012 11:02:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
7/27/2012
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil on Rail Loop and Facilities Area <br />Site: Hayden Gulch Loadout Permit Action: SLl Permit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 024 <br />Date: 6/15/2012 <br />User: JLE <br />State: Colorado <br />County: Routt <br />Agency or organization name: DBMS <br />Abbreviation: None <br />Filename: 0081 -024 <br />HOURLY EQUIPMENT COSTShift basis: 1 ner day <br />Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dume Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br />Cast Breakdown! grrvner 'W-1- Term C.,.,,. ,f � ,.,:...,.e.. <br />Total work team cost/hour: $723.24 <br />MATERIAL QUANTITIES <br />Initial volume: 80,180 CCY Swell factor: 1.125 <br />Loose volume: 90,203 LCY <br />Source of estimated volume: Division of Reclamation, Mining Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />. Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating costihour: <br />$232.77 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op, cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator costfhour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$723.24 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $723.24 <br />MATERIAL QUANTITIES <br />Initial volume: 80,180 CCY Swell factor: 1.125 <br />Loose volume: 90,203 LCY <br />Source of estimated volume: Division of Reclamation, Mining Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />C1RCE5 Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,550 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />34.04 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />C1RCE5 Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.