My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1992081 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-06-18_REVISION - C1992081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:43 PM
Creation date
7/31/2012 10:59:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
6/18/2012
Doc Name
Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip TAIIR <br />Site: Hayden Gulch Loadout Permit Action: SL Pennit/Job#: C1992081 <br />PROJECT IDENTIFICATION <br />Task #i: 501 State: Colorado Abbreviation: None <br />Date: 611812012 County: Routt Filename: COSI -501 <br />User: JLE <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D l OT - IOSU <br />Ripper Attachment: I -Shank Ripper <br />Cost Breakdown: <br />Horsepower: 574 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$113.98 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper Operating Cost/Hour: <br />$11.39 <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total Unit Cost/Hour: <br />$345.63 <br />Total Fleet Cost/Hour: <br />$691.27 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA <br />BCY NA <br />Area: 70.00 acres Rip Depth (ft): 3,00 <br />Volume: 338,800 BCY or CCY <br />Source of estimated quantity: <br />Seneca II -W Permit Page 25 -1 -19 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />4.49 <br />mph <br />Average Ripping Width: <br />6.74 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.761 <br />acres /hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.761 <br />Acres/hr <br />Site Altitude: <br />7,500 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shifUday) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.63 <br />Acreslhr <br />Adjusted Hourly Fleet Production: <br />1.26 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 2 Grades(s) <br />Total job time: <br />55.40 Hours <br />Unit cost: $547.094 Per acre <br />Total job cost: <br />$38,297.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.