Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 047 Page 2 oft <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />HAYDEN <br />Total one -way travel distance: <br />10,00 miles <br />Average Travel Speed: <br />25.00 tnpli <br />Total Non - Roadable MoblDemob Cost * <br />$5,321.00 <br />`* two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />0.80 <br />** one round trip, no haul rig; <br />$389 47 <br />Transportation Cycle Time; <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Nan - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.40 <br />0.40 <br />0.40 <br />0.40 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.80 <br />0.80 <br />Total job time: 3.60 Hours <br />Total job cost: $5,710.47 <br />CIRCES Cost Estimating Sollwam <br />