Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Remove TAHR Surface Material to Pit <br />Site: Hayden Gulch Loadout Permit Action: SL1 <br />PROJECT IDENTIFICATION <br />Pale 1 o12 <br />PermitJJob #: C1992081 <br />Task #: 502 State: Colorado Abbreviation: None <br />Date: 6118/2012 County: Routt Filename: 0081 -502 <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COSTShift basis: leer day <br />icraper: I Cat 637G <br />- Dozer. I NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -- -Motor Grader: CAT 14M <br />-Water Truck: Water Tan <br />C'ntit RrenkildtWT V CrmnPr Wnrtr Tpnm <br />v1p ush -pull <br />ter, 10,000 Gal. <br />Total work team cost/hour: 11,649.70 <br />MATERIAL UANTITIES <br />Initial volume: 1 12,900 CCY Swell factor: 1.000 <br />Loose volume: 112,900 LCY <br />Source of estimated volume: Seneca II -W Permit Page 25 -1 -22 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />l00 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour, <br />$103.90 <br />NA <br />NA <br />NA <br />$39.30 <br />$54.68 <br />Operating cost/hour: <br />$232.77 <br />NA <br />NA <br />NA <br />$16.78 <br />$29.31 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0,00 <br />$0.00 <br />Operator cosVbour: <br />$24.95 <br />NA <br />NA <br />NA <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />$80.54 <br />$122.68 <br />Number of Units: <br />4 <br />0 <br />1 0 <br />0 <br />1 1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,446.48 <br />1 Support: <br />$0.00 <br />Maint: <br />$203.22 <br />Total work team cost/hour: 11,649.70 <br />MATERIAL UANTITIES <br />Initial volume: 1 12,900 CCY Swell factor: 1.000 <br />Loose volume: 112,900 LCY <br />Source of estimated volume: Seneca II -W Permit Page 25 -1 -22 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,550 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Gravel - Dry <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds _ <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />