Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 040 Page 2 of 3 <br />Truck Bed (volume) Basis: <br />Struck Volume: 8.00 LCY <br />Heaped Volume: 10.00 LCY <br />Average Volume: 9.00 LCY <br />Adjusted Volume: 10.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 9.74 LCY <br />Loader, Tool Capacity <br />Bucket Size Class: Large <br />Rated Capacity: 1330 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist a ire ates 95- 100 %) 0.975 <br />Adjusted Capacity: 3.247 LCY <br />Job Condition Corrections: Site Altitude (ft.): 6400 feet <br />Net Correction: 0.830 1 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 3 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA <br />passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Leader <br />Source <br />(CAT HB) <br />(CAT HB) <br />Altitude Ad': <br />1.000 <br />1.000 <br />Job Efficiency: <br />0.830 <br />0.830 <br />Net Correction: 0.830 1 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 3 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA <br />passes <br />minutes <br />Cycle Time Factors <br />factor min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stockpile: <br />NA <br />NA <br />Cat HB <br />Truck Ownership: _ <br />NA <br />NA <br />(Cat HB <br />Operation: <br />NA <br />NA <br />(Cat HB) <br />Dump Tar et: <br />1 NA <br />I NA <br />I (Cat HB) <br />Truck Cycle "l'ime: <br />Truck Exchange Time: 0.50 <br />Truck Load Time: 0.742 <br />Truck Maneuver and Dump Time: 0.80 <br />Truck Travel (Haul 8c Return) Time: <br />maintained 3.0 <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />NA minutes <br />0,321 minutes <br />0.742 minutes <br />Minutes Adjusted for site altitude: 0.500 Minutes <br />Minutes Adjusted for site altitude: 0.742 Minutes <br />Minutes Adjusted for site altitude: 0.800 Minutes <br />Road Condition: Firm, smooth, rolling, dirdlt. surfaced, watered, <br />CIRCES Cost Estimating Software <br />