My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1992081 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-06-18_REVISION - C1992081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:43 PM
Creation date
7/31/2012 10:59:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
6/18/2012
Doc Name
Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task # 040 Page 2 of 3 <br />Truck Bed (volume) Basis: <br />Struck Volume: 8.00 LCY <br />Heaped Volume: 10.00 LCY <br />Average Volume: 9.00 LCY <br />Adjusted Volume: 10.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 9.74 LCY <br />Loader, Tool Capacity <br />Bucket Size Class: Large <br />Rated Capacity: 1330 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist a ire ates 95- 100 %) 0.975 <br />Adjusted Capacity: 3.247 LCY <br />Job Condition Corrections: Site Altitude (ft.): 6400 feet <br />Net Correction: 0.830 1 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 3 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA <br />passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Leader <br />Source <br />(CAT HB) <br />(CAT HB) <br />Altitude Ad': <br />1.000 <br />1.000 <br />Job Efficiency: <br />0.830 <br />0.830 <br />Net Correction: 0.830 1 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 3 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA <br />passes <br />minutes <br />Cycle Time Factors <br />factor min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stockpile: <br />NA <br />NA <br />Cat HB <br />Truck Ownership: _ <br />NA <br />NA <br />(Cat HB <br />Operation: <br />NA <br />NA <br />(Cat HB) <br />Dump Tar et: <br />1 NA <br />I NA <br />I (Cat HB) <br />Truck Cycle "l'ime: <br />Truck Exchange Time: 0.50 <br />Truck Load Time: 0.742 <br />Truck Maneuver and Dump Time: 0.80 <br />Truck Travel (Haul 8c Return) Time: <br />maintained 3.0 <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />NA minutes <br />0,321 minutes <br />0.742 minutes <br />Minutes Adjusted for site altitude: 0.500 Minutes <br />Minutes Adjusted for site altitude: 0.742 Minutes <br />Minutes Adjusted for site altitude: 0.800 Minutes <br />Road Condition: Firm, smooth, rolling, dirdlt. surfaced, watered, <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.