Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 040 Page 3 of 3 <br />Haul Route <br />Seg # <br />Haul Distance <br />Grade { °!°) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />Time <br />min <br />(Ft) <br />1 <br />( %) <br />N <br />(fpm) <br />Time <br />2874 <br />3.703 <br />Truck Unit Production <br />(min) <br />1 <br />10560.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />3.843 <br />Haul Time: <br />Return Route: <br />3.843 <br />minutes <br />CIRCES Cost Estimating Sntiware <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( ° /u) <br />Roll. Res <br />M) <br />Total Res <br />M <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Loading Tool unit <br />1 <br />10560.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />3.703 <br />Truck Unit Production <br />CIRCES Cost Estimating Sntiware <br />Return Time: 3.703 <br />minutes <br />Total Truck Cycle Time: 9.588 <br />minutes <br />Loading Tool unit <br />Production <br />470.54 <br />LCYIHour Adjusted for job efficiency: <br />390.55 LCYIHour <br />Truck Unit Production <br />60.95 <br />LCYIHour Adjusted for job efficiency: <br />50.59 LCYIHour <br />Optimal No, of Trucks: <br />8 <br />Truck(s) Selected Number of Trucks: <br />6 Trucks) <br />Adjusted hourly truck team production: 303.54 <br />LCYIHour <br />Adjusted single truck/loader team production: 303.54 <br />LCYIHour <br />Adjusted multiple truck/loader team production: 303.54 <br />LCYIHour <br />JOB TIME AND COST <br />Fleet size: <br />I <br />Team(s) Total job time: 7.01 <br />Hours <br />Unit cost: <br />$I.687 <br />/LCY Total job cost: $3,588.02 <br />CIRCES Cost Estimating Sntiware <br />