My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1992081 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-06-18_REVISION - C1992081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:43 PM
Creation date
7/31/2012 10:59:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
6/18/2012
Doc Name
Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pale I of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean Sediment from Ponds Once During Liability Period <br />Site: Hayden Gulch Loadout Permit Action: SL1 Permitllob#: 01992081 <br />PROJECT IDENTIFICATION <br />Task #: 040 State: Colorado <br />Date: 6/18/2012 County: Routt <br />User. JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />!r ut ment Uescn tion <br />Truck Loader Team - Truck: Generic 8 -10 c , 6x4 <br />- Loader: Cat 336D L 10' -6" Stick <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cost Breakdown! Tnlckll.n.nder Team <br />NA <br />NA <br />NA <br />NA <br />Abbreviation: None <br />Filename: COS 1-040 <br />Shift basis: 1_ per day <br />5nnnnrt Fnuinment k4ninfenanrr Fnninment <br />Total work team cost/hour: $512.05 <br />MATERIAL QUANTITIES <br />Initial volume: 1,874 CCY Swell factor: 1.135 <br />Loose volume: 2,127 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />Description. Earth - Wet excavated <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.10 LCY <br />CIRCES Cost Estimating Saftware <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$9.13 <br />$42.44 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$49.7.2 <br />$77.83 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0,00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$58.85 <br />$158.95 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $512.05 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $512.05 <br />MATERIAL QUANTITIES <br />Initial volume: 1,874 CCY Swell factor: 1.135 <br />Loose volume: 2,127 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />Description. Earth - Wet excavated <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.10 LCY <br />CIRCES Cost Estimating Saftware <br />
The URL can be used to link to this page
Your browser does not support the video tag.