My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-28_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1997-11-28_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 2:57:50 PM
Creation date
7/18/2012 7:47:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
11/28/1997
Doc Name
October 1997 Monthly Report and DMRs
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1 <br /> October 1997 Monthly Report <br /> Page 3 <br /> 4) completion of site neutralization (with limestone and <br /> quicklime kiln dust) . <br /> 5) completion of capping exposed tailings, amending with <br /> limestone, fertilizing, seeding and mulching the <br /> disturbed areas within the site. <br /> 6) rebuilding selected wetland areas with a mixture of <br /> composted steer manure and gravel and seeding these <br /> areas. <br /> Sunnyside Mine Pool Mitigation - Alkaline Solution Injection <br /> Activity, on this project, in October consisted of completing <br /> the dismantling of the system for the season. <br /> The water pool pH, at the American Tunnel bulkhead, on October <br /> 13 , 1997 was 5.55 and the bulkhead pressure was 318 psi. <br /> Sunnyside will continue to monitor these parameters. <br /> Cement Creek Diversion and Water Treatment <br /> Cement Creek diversion and water treatment was active <br /> continuously throughout October. Due to Cement Creek flow <br /> quantities, diverted flows for water treatment were controlled <br /> throughout this period except for short time spans when Cement <br /> Creek flow dropped below the quantity targeted for treatment <br /> (ie. 1000-1100 G.P.M. ) . The treated flows for October ranged <br /> from 868 G.P.M. to 1021 G.P.M. <br /> Attached are results from flow and quality monitoring of; <br /> Cement Creek diverted for treatment (CC-1B) ; American Tunnel <br /> flow before treatment (AT-INFEL) ; dissolved metals analysis of <br /> the AT-004 discharge; and Cement Creek below the AT-004 <br /> discharge point (CC-20) for September samples. The October <br /> results were not received by the date of this report and will <br /> be submitted with the October report. <br /> Mainstem Stream Monitoring and Reference Point Stream <br /> Monitoring <br /> Sunnyside sampled the reference point (A-72) and the three <br /> gaging stations (A-68, M-34 and C-48) on October 8, 1997. <br /> These results are attached. <br /> The provisional flow from the outside gage at A-72 for the <br /> October 8, 1997 sample was 212 cfs which is in the <br /> intermediate flow category (100 < Q < 300 cfs) . <br /> The reported zinc values which are an average of the result <br /> from two labs was 365 ug/l. <br />
The URL can be used to link to this page
Your browser does not support the video tag.