My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-28_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1997-11-28_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 2:57:50 PM
Creation date
7/18/2012 7:47:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
11/28/1997
Doc Name
October 1997 Monthly Report and DMRs
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 L <br /> October 1997 Monthly Report <br /> Page 2 <br /> the site and is in agreement that reclamation was completed <br /> according to the Consent Decree work plan and MLR standards. <br /> - Gold Prince - Mill Tailings <br /> This project was completed in September, 1997 . DMG inspected <br /> this site in September and again in October. Snow cover that <br /> existed during the September 22 , 1997 inspection had melted <br /> allowing an opportunity for a second inspection on October 3, <br /> 1997 . <br /> DMG agrees that reclamation was completed according to the <br /> amended Consent Decree work plan and MLR standards. <br /> Site monitoring results for samples taken in September are <br /> attached. <br /> - Ransom Tunnel <br /> This project was completed in July, 1997 . DMG has inspected <br /> the site and is in agreement that reclamation was completed <br /> according to the Consent Decree work plan and MLR standards. <br /> - Longfellow - Koehler Mine Waste Project <br /> This project was completed and inspected on October 3, 1997. <br /> Work completed in October included final site grading and <br /> completion of seeding and mulching the disturbed areas. <br /> DMG is in agreement that this project has been completed <br /> according to the Consent Decree work plan and MLR standards. <br /> Attached are water quality monitoring results for samples <br /> taken in October. <br /> - London Mine Portals - Waste Dumps <br /> This is a "B List" project. Therefore, no work, permitting or <br /> arrangement for access is planned until it becomes evident <br /> that the work plan for this project requires implementation. <br /> - Pride of the West Tailings <br /> The project was completed and inspected on October 20, 1997 . <br /> Completed work in October includes; <br /> 1) final site grooming. <br /> 2) cleaning of sediment traps. <br /> 3) rip-rapping the Animas River bank to prevent the river <br /> from changing course through erosion to a path through <br /> the remediation site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.