Laserfiche WebLink
be evenly rcdistributcd to a dcpth of 6 inchcs. <br />6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Drill pad and access road reclamation details are provided in the original prospecting NOI <br />for each drill pad to be covered undcr this ground water discharge NOI. Rcfcr to thc <br />coliimn in attached Table 1 which provides the original prospecting NOI numher for each <br />drill pad. For most of the drill pads, an average minimum of six inches of soil will be <br />stripped and stockpiled for future reclamation. Soil stockpiles will be covered with erosion <br />control material. During final reclamation, compacted surfaces will be ripped and soil will <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Borehole plugging and abandonment details are provided in the original prospecting NOI <br />for each borehole to be covered undcr this ground water discharge NOI. Rcfcr to thc <br />column in attached Table 1 which provides the original prospecting NOI number for each <br />drill pad. Basically, boreholes will be plugged to the surface using inert fill and cement <br />plugs to isolate the water bearing zones. All material and plugging methods will conform to <br />Rule 5.4 of the Hard Rock/Metal Mining Rules and Regulations, and to any additional <br />ureau of Land Management, county, and local ordinances and <br />regulations. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Surface reclamation aetaiis are proviaea in the original prospecting NUl for eacn drill paa to oe <br />covered undcr this ground water discharge NOI. Rcfcr to thc column in attached Table 1 <br />which provides the original prospecting NOI number for each drill pad. Basically, pits will be <br />closed and the drill pad will be recontoured to blend into existing topography. Depressions that <br />collect storm water and allow it to accumulate and pool will be filled to drain. Compacted <br />over the distill areas. The drill pad will then he reseeded with the seed mix approved in the <br />original prospecting NOI, and cleared brush will be redistributed over the reseeded area. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />Road reclamation details are provided in the original prospecting NOI for each drill pad to <br />be covered under this ground water discharge NOI. Refer to the column in attached Table <br />1 which provides the or prospecting NOI number for each mill pad. Basically, similar <br />procedures as- hecc used on drill pads will be u ed for newly constructed roads subjoct to <br />reclamation. The roadway will be regraded to blend in with existing terrain. compacted <br />surfaces will be ripped to a depth of 18 inches, stockpiled soil material will be evenly <br />redistributed, disturbed areas will be reseeded with the seed mix approved in the original <br />prospecting NOI, and cleared brush will be reaislribuled over the reseeded area. <br />