My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-05_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2012-07-05_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:44 PM
Creation date
7/9/2012 10:21:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
7/5/2012
Doc Name
Preliminary Adequacy Review & Cost Estimate
From
DRMS
To
Ron Thompson - New Elk Coal Company, LLC
Type & Sequence
RN3
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 107 <br />MOTOR GRADER WORK <br />Task description: Grade Borrow Area 3 <br />Site: Lorencito Canyon Mine <br />Permit Action: RN3 <br />PROJECT IDENTIFICATION <br />Task #: 016 State <br />Date: 5/31/2012 County <br />User: JDM <br />Colorado <br />Las Animas <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: Multi -Shank Ripper <br />Cost Breakdown <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />MATERIAL OUANTITIES <br />Total Area to be graded or ripped: 2.70 <br />acres <br />Utilization % <br />Ownership Cost/Hour: <br />$42.77 <br />NA <br />Operating Cost/Hour: <br />$67.12 <br />mph <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />30 <br />0 <br />Operator Cost/Hour: <br />$24.47 <br />feet <br />NA <br />Total Unit Cost/Hour: <br />$134.36 <br />Net grading or ripping width per pass: <br />Total Fleet Cost/Hour: <br />$137.61 <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />MATERIAL OUANTITIES <br />Total Area to be graded or ripped: 2.70 <br />acres <br />Source of estimated acreage: Table 2.05.4 -1f <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 7100 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />1.5609 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.5609 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />1.73 Hours <br />Unit cost: $86.08 per acre <br />Total job cost: <br />$232.00 <br />Permit/Job #: C1996084 <br />Abbreviation: None <br />Filename: C084 -001 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.