Laserfiche WebLink
Page 4 of 107 <br />TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil from Stockpile BA #1 to Fill 7a <br />Site: Lorencito Canyon Mine Permit Action: RN3 Permit/Job #: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 025 State: Colorado Abbreviation: None <br />Date: 5/31/2012 County: Las Animas Filename: C084 -002 <br />User: JDM <br />Agency or organization naive: DRMS <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />Truck Loader Team - Truck: <br />Cat 773F <br />- Loader: <br />CAT 990H high lift <br />Support Equipment -Load Area: <br />Cat D9T - 9SU <br />-Dump Area: <br />Cat D9T - 9SU <br />Road Maintenance -Motor Grader: <br />CAT 14M <br />-Water Truck: <br />Water Tanker, 5,000 Gal. <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $1,313.98 <br />MATERIAL OUANTITIES <br />Initial volume: 3,440 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization - machine: <br />100 <br />95 <br />50 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$62.45 <br />$116.82 <br />$80.19 <br />$80.19 <br />$39.30 <br />$21.46 <br />Operating cost/hour: <br />$117.76 <br />$149.38 <br />$70.34 <br />$140.68 <br />$16.78 <br />$11.46 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$3.59 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />$38.49 <br />$38.49 <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$202.50 <br />$304.87 <br />$192.60 <br />$259.35 <br />$80.54 <br />$71.62 <br />Number of Units: <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $709.87 <br />Support: $451.95 <br />Maint: $152.16 <br />Total work team cost/hour: $1,313.98 <br />MATERIAL OUANTITIES <br />Initial volume: 3,440 <br />CCY <br />Loose volume: 3,870 <br />LCY <br />Source of estimated volume: <br />Table 2.05.4 -1f <br />Source of estimated swell factor: <br />Cat Handbook <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 <br />Description: Earth - <br />Rated Payload: 122,52 <br />Payload Capacity: 48.05 <br />Truck Bed (volume) Basis: <br />Swell factor: 1.125 <br />Pounds/LCY <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />