My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-05_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2012-07-05_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:44 PM
Creation date
7/9/2012 10:21:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
7/5/2012
Doc Name
Preliminary Adequacy Review & Cost Estimate
From
DRMS
To
Ron Thompson - New Elk Coal Company, LLC
Type & Sequence
RN3
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 107 <br />076 <br />077 <br />078 <br />083 <br />085 <br />090 <br />091 <br />092 <br />Fertilize Mine Site During Year 3 <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />84.00 <br />$10,927.56 <br />$4,672.16 <br />$981.52 <br />$79,059.76 <br />$101,765.60 <br />$19,001.75 <br />$2,796.82 <br />$28,826.70 <br />Broadcast Seed Borrow Area 3 <br />REVEGE <br />4.05 <br />Direct Shrub Seeding <br />REVEGE <br />9.00 <br />Clean Sediment Ponds at Mine Site <br />TRUCKI <br />128.86 <br />Site Maintenance <br />SITEMAINT <br />ENANCE <br />40.00 <br />Mobilize/Demobilize for Initial Reclamation <br />MOBILIZE <br />4.28 <br />Mobilize/Demobilize Equipment for Pond <br />Cleaning <br />MOBILIZE <br />4.28 <br />Mobilize/Demobilize Equipment for Site <br />Maintenance <br />MOBILIZE <br />4.28 <br />SUBTOTALS: <br />703.58 <br />$ $623,731.08 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$12,599.37 <br />Performance bond: <br />1.05 <br />Total = <br />$6,549.18 <br />Job superintendent: <br />351.79 <br />Total = <br />$20,861.15 <br />Profit: <br />10.00 <br />Total = <br />$62,373.11 <br />TOTAL O & P = <br />$102,382.81 <br />CONTRACT AMOUNT (direct + O & P) = <br />$726,113.89 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />1 11 <br />4.25 <br />5.00 <br />Total = 0.00 <br />Total = $30,859.84 <br />$36,305.69 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $169,548.34 <br />TOTAL BOND AMOUNT (direct + indirect) = $793,279.42 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.