Laserfiche WebLink
i <br /> March 1997 Monthly/1st Quarter Report <br /> Page 4 <br /> - Cement Creek Diversion and Water Treatment <br /> Cement Creek diversion and water treatment was active <br /> continuously throughout March and the 1st Quarter. The entire <br /> flow of Cement Creek was diverted and treated along with the <br /> portal flow from the American Tunnel. During the 1st Quarter, <br /> flows diverted for treatment ranged from 167 GPM to 848 GPM. <br /> Attached are results from flow and quality monitoring of; <br /> Cement Creek diverted for treatment (CC-1B) ; American Tunnel <br /> flow before treatment (AT-INFEL) ; dissolved metals analysis of <br /> the AT-004 discharge; and Cement Creek below the AT-004 <br /> discharge point (CC-20) . <br /> As explained in the December report, there was approximately <br /> 20-30 GPM more flow at CC-20 than being discharged from the <br /> AT-004 discharge point. This water is made up of excess <br /> reagent mix water being diverted for the water treatment <br /> system from Minnehaha Creek and seeps and springs entering the <br /> creek bed between the diversion point and the CC-20 monitoring <br /> point. <br /> Mainstem Stream Monitoring and Reference Point Stream <br /> Monitoring <br /> Sunnyside sampled the reference point (A-72) on March 5, 1997. <br /> These results are attached. <br /> The provisional flow from the outside gage at A-72 for the <br /> March 5, 1997 sample was 78 cfs which is in the low flow <br /> category (Q < 100 cfs) . The reported dissolved zinc value is <br /> 755 ug/1 which is the average of results from two labs and of <br /> repeat analysis by these two labs. <br /> Repeat analysis were requested because the average resulted in <br /> an index value of 2.02. Under the terms of the Consent Decree <br /> agreement, observations with an index value greater that +2 <br /> will be reanalyzed. <br /> Index numbers for the March sample using an average of the four <br /> results is calculated as follows: <br /> Xi = 755 <br /> Xf = 519 <br /> Sf = 124 <br /> Ni = (Xi-Xf)/Sf <br /> Ni = (755-519)/124 <br /> Ni = 1 .90 <br /> The index number graph and updated reporting table are attached. <br />