Laserfiche WebLink
American Tunnel Bulkhead Costs <br /> Page 2 <br /> 12" Class 600 gate valve Lump Sum $24411 <br /> 1" schedule 80 316L SS piping <br /> w/collars, valves, fittings, <br /> pressure gauges Lump Sum $1208 <br /> Extension piping above and below <br /> bulkhead Lump Sum $2605 <br /> Ready Mix concrete - 6 1/2 yards Lump Sum $ 835 <br /> Non-shrink grout (50# bags) @ $10.16 2 $ 20 <br /> PVC screen & bolts Lump Sum $ 634 <br /> 16" Sona tube & bulkhead dri-mix <br /> for pipe supports - 40 bags Lump Sum $ 203 <br /> Sandblaster sand #30 grit <br /> (100# bags) @ $7.63 20 $ 153 <br /> SubTota 1 $70,587 <br /> INSTALL VENTILATION: <br /> EQUIPMENT: <br /> Locomotive (in Misc Costs) <br /> 40 HP fans @ $3500 purchase 2 $7000 <br /> CONTRACT LABOR: $7184 <br /> MATERIALS: <br /> Vent Bag 4 79 <br /> SubTota 1 $57983 <br /> PLACE LIMESTONE BETWEEN BULKHEAD & COFFER DAM: (5 men - 2 days) <br /> EQUIPMENT: <br /> Locomotive (in Misc Costs) <br /> 1 1/4 LHD @ $35/hr 20 $ 700 <br /> DIRECT LABOR @ $16. 39/hr 100 $1639 <br /> BENEFITS @ 35% of wages $ 574 <br /> INDIRECT LABOR (outside man) @ $16. 39 20 hrs $ 328 <br /> BENEFITS @ 35% of wages $ 115 <br /> MATERIALS: <br /> Limestone (58000 lbs) $1633 <br /> Lime (15000 lbs) $1100 <br /> SubTotal $6089 <br /> BUILD FORMS, INSTALL REBAR, BRACE FORMS: (5 men - 12 days; 1 man - 3 days) <br /> EQUIPMENT: <br /> Locomotive (in Misc Costs) <br /> Misc. Tools (in Misc Costs) <br /> Welder & torch @ $100/day 3 days $ 300 <br /> GD 83 Jackleg (in Misc Costs) <br />