Laserfiche WebLink
ti <br /> AMERICAN TUNNEL BULKHEAD COSTS <br /> TASK AND COST ITEM QUANTITY EXTENDED <br /> COST <br /> INITIAL SITE CLEANING: (2 men - 6 days) <br /> EQUIPMENT: <br /> 2 yd LHD @ $45/hr 120 hrs $5400 <br /> DIRECT LABOR @ $16.39/hr 120 hrs $1967 <br /> BENEFITS @ 35% of wages $ 688 <br /> INDIRECT LABOR (outside man) @ $16.39/hr 60 hrs $ 983 <br /> BENEFITS @ 35% of wages S 344 <br /> SubTotal $9382 <br /> BUILD COFFER DAM, INSTALL PIPING, SET REBAR ANCHORS <br /> AND FINE SITE CLEANING: (5 men - 12 days) <br /> EQUIPMENT: <br /> Misc hand tools (in Misc Costs) <br /> Bobcat loader & hydraulic hammer rent Lump Sum $1756 <br /> M-20 Reed concrete pump ($39786 value) <br /> $2000/mo; $800/wk 3 days $ 800 <br /> Moran car (covered under pour <br /> bulkhead section) <br /> Concrete pipe and hose ($4211 value) <br /> $350/mo; $150/wk 1 wk $ 150 <br /> Locomotive (in Misc Costs) <br /> GD 83 Jackleg (in Misc Costs) <br /> Sandblaster ($1375 value) @ $20/day 3 days $ 60 <br /> Demolition hammer rental Lump Sum $ 342 <br /> DIRECT LABOR @ $16. 39/hr 600 hrs $9834 <br /> BENEFITS @ 35% of wages $3442 <br /> INDIRECT LABOR (outside man) @ $16. 39/hr 120 hrs $1967 <br /> BENEFITS @ 35% of wages $ 688 <br /> MATERIALS: <br /> Plywood (3/41lx4'x8' ) @ $21.59 10 $ 216 <br /> 21'x411x12' @ $ 4.95 52 $ 257 <br /> All thread (form ties) Lump Sum $ 155 <br /> Stainless steel inlet trash box Lump Sum $ 958 <br /> Stainless steel cable - pipe ties Lump Sum $ 440 <br /> 12" schedule 80s 316L SS piping <br /> w/flanges, seep collars & <br /> bolts Lump Sum $19453 <br />