Laserfiche WebLink
ly ,` III IIIIIIIIIIIII III <br /> 999 <br /> STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources P 74, <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 03) 567 0�iril <br /> FAX:(Phone (3)832-8106 <br /> FAX:(303)832-8106 OFM V011A <br /> C DEPARTMENT OF <br /> DATE: June 30, 1997 NATURAL <br /> RESOURCES <br /> TO: Larry Perino, SGC Reclamation Manager Roy Romer <br /> Governor <br /> FROM: Wally Erickson 6)6 ExecutveDirector <br /> Michael B Long <br /> RE: Bulkhead Pre-pour Inspection, Ransom Portal, Sunnyside Gold Corp., Division Director <br /> CDPS No. CO-0044768, DMG File M-77-378. <br /> On 6/16/97, DMG conducted a pre-pour inspection of the preparations completed for the <br /> Ransom Portal interior bulkhead. The Ransom Portal is located approximately 7.5 miles <br /> NE of Silverton, on the north side of Eureka Gulch, at approximately 10,500' elevation, in <br /> portions of the SW 1/4 of Section 19, T42N, R6W, NMPM, San Juan County. <br /> Inspection Date: 6/16/97 Inspection occurred from 10:00 am through 11 :00 <br /> am (1 hour inspection + 4 hours total travel time) <br /> SGC Representative: Mr. Larry Perino <br /> DMG Inspector: Wally Erickson A E 711t�'7 <br /> Field Conditions: Cloudy and warm <br /> Observations: Preparations for concrete pour for interior bulkhead were near completion. <br /> Interior bulkhead location was approximately 300' from portal mouth. Tunnel constriction <br /> at prepared location allows final bulkhead to function as wedge plug. <br /> Loose rock was not observed at interior bulkhead location. Tunnel walls and roof at <br /> interior bulkhead location were clean and dry. SGC representatives stated that <br /> preparations included removal of loose rock, sandblasting, washing, and vacuuming of <br /> roof, walls and floor. No open fractures were observed at the interior bulkhead location. <br /> Parent igneous rock appeared competent. Floor of bulkhead location will be final washed <br /> and vacuumed prior to pour. Pump and 6" diameter pipe were installed, directing tunnel <br /> drainage through bulkhead location. Outlet of drain pipe discharged to Eureka Gulch, <br /> discharge was visually estimated at 20 gpm, discharge appeared clear, no sample taken. <br /> Concrete forms were constructed of 8"x 8", 2"x 6" and 2"x 12" lumber. Operator stated <br /> that all lumber was strength rated fir. Concrete forms fitted tightly with parent rock. <br /> Water side of form was faced with double 2"x 12" lumber. Air side of form was faced <br /> with double 2"x 6" lumber. Concrete fill pipe collar with slide gate was installed at top of <br />