Laserfiche WebLink
Gold Prince Bulkhead <br /> Page 2 <br /> SGC feels confident this connection is still valid but has <br /> requested a bulkhead design for the maximum potential head (ie <br /> ground surface) . This is 65 feet. Therefore, there is no longer <br /> any need for the monitoring pipe that DMG requested and SGC agreed <br /> to if the Sunnyside Mine connection could not be confirmed. In <br /> addition, there will be a second bulkhead also designed for the <br /> maximum potential head at that site. This is 14 feet. For these <br /> reasons, SGC requests that DMG agree with this implementation of <br /> the work plan with no monitoring pipe installations. <br /> Please contact me if you have any questions or do not agree with <br /> this method of work plan implementation that SGC believes is <br /> necessary due to field conditions. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br /> cc: Sarah Johnson, CDPHE <br />